Design, Supply, Install, Built and Maintain Electronic Cleanroom System(Class 1,2,3,4,5,6,7,8 and 9)with reference to ISO 14644-1(1999). Certification of cleanroom in accordance to NEBB(IEST procedures)and ISO14644-2.
Design, Supply, Install, Built and Maintain Pharmaceutical Cleanroom System(Grade A,B,C and D)with reference to GMP and FDA compliance including preparation of validation protocol(VMP)
Design, Supply, Install Service & Maintenance of Heating, Mechanical Ventilation System and Air Conditioning System for Conditioning.
Supply & Install HT, Transformer and LV System. Also Cabling Works and Lighting Works.
Design, Supply, Install, Built and Maintain of Process Utility System, such as:
【1】 Compressed Dry Air
【2】 Nitrogen System
【3】 Process Vacuum
【4】 Process Exhaust
【5】 Process Cooling
【6】 Scrubber System
【7】 Production Equipment/Tools Hook Up Works
Design, Supply and Installation of Building Automation System(FMCS or BMS) & DDC/PLC Control System.