1、Pre-phase survey and communication
2、Plan design and budget
3、Pre-phase formalities handing
4、Project construction management
5、Handing and handover of completion formalities
6、Guarantee and maintenance
7、After-construction tracking
Build 3D information model by integration design drawings of all professions and layout of production machines,in order to improve the design quality and reduce the reworks in the construction stage. In this
Case ,the visual management can be realized throughout the whole life cycle of the building from the preliminary design stage to the final turn key hanover
![]() |
|
![]() |
|
|
|
|
|
Safety and health policy
All the staff comply with the provisions of EHS management,the law regulations,the implementation of the following two health,safety and peace of mind as the basis for the reference to implement activities based on Health.Safety.Ease.
Comply with 6S
Take Ten Measures Safety as Benchmark to avoid damages
--------------------------------------------------------------------------------------
New factory or additions construction and reconstruction.